ARGO designed and installed a SCADA/EMCS system with future plans to mandate turning over operation control of the upper base to the Agency. The customer had a Building Automation System (BAS) installed in Building 201. The site required local and remote SCADA/EMCS monitoring of the existing major mechanical and electrical systems. The equipment (Both old and new) was not being monitored outside of the customers’ network, which does not meet FEDS guidelines and industry best practices. The new system connected to the existing BAS. Existing critical HVAC and electrical systems vary in age and condition. Without a centralized monitoring system, there is a higher risk of component failure and components not receiving urgent attention when needed.